Fairfield Farm

6 turbines · application withdrawn · Cumbria

Wind farm facts

StatusApplication Withdrawn
County / regionCumbria
Turbines6
Installed capacity7.8 MW
Turbine capacitynot recorded
Tip heightnot recorded
Operator (or applicant)Windprospect
Turbine manufacturernot recorded
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

2004 2006 2008 2010 2012 2014 2016 2018 2020 Original scheme Application submitted September 2005 Later scheme Application submitted September 2006 Refused April 2007 Permission granted May 2008 Granted on appeal May 2008 Under construction August 2010 Operational March 2011 Permission expired May 2019

The register links a second scheme on this site (REPD ref 3613, Operational): 5 turbines · 1.3 MW each · applicant Windprospect. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3615.

What the register tells us

That works out at 1.3 MW per turbine on average.