🌬️ Onshore wind farm

Ferneylea Farm
East Lothian

Recorded in WhichWindTurbine: 2 wind turbines in operation. Point the app at one of them to see its profile in real time.

2
turbines
1.5 MW
MW total
0.75 MW
per turbine
71 m
tip height

📍 2 turbines mapped — each dot is a turbine recorded in the database. Average position: 55.91349 N · 2.4187 W.

Ferneylea Farm

2 turbines · operational · East Lothian

Wind farm facts

StatusOperational
County / regionEast Lothian
Turbines2
Installed capacity1.5 MW
Turbine capacity0.75 MW
Tip height71 m
Operator (or applicant)CBK Galbraith
Turbine manufacturernot recorded
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~2037201520202025today12345
  1. 1Sep 2010 — Application submitted
  2. 2Mar 2012 — Permission granted
  3. 3Sep 2012 — Granted on appeal
  4. 4Dec 2014 — Under construction
  5. 5Jan 2015 — Operational

The register also records a planning permission expiry in Mar 2011, in the same month as, or before, the permission was granted: it refers to an earlier permission, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 5 years.

The register links a second scheme on this site (REPD ref 5386, Application Withdrawn): 6 turbines · 3 MW each · 115 m tip height · applicant XSCH. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 6388.

What the register tells us

The application was determined in about 18 months. Construction to first power took about 1 month. Permission was ultimately granted on appeal in September 2012. A planning permission on this site expired in March 2011. The scheme has been operating for about 11 years. That works out at 0.75 MW per turbine on average.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.