Recorded in WhichWindTurbine: 2 wind turbines in operation. Point the app at one of them to see its profile in real time.
📍 2 turbines mapped — each dot is a turbine recorded in the database. Average position: 55.91349 N · 2.4187 W.
2 turbines · operational · East Lothian
| Status | Operational |
|---|---|
| County / region | East Lothian |
| Turbines | 2 |
| Installed capacity | 1.5 MW |
| Turbine capacity | 0.75 MW |
| Tip height | 71 m |
| Operator (or applicant) | CBK Galbraith |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
The register also records a planning permission expiry in Mar 2011, in the same month as, or before, the permission was granted: it refers to an earlier permission, left off the axis.
DevelopmentConstructionOperationAhead (repowering horizon at 22 years)
From application to operation, this scheme took about 5 years.
The register links a second scheme on this site (REPD ref 5386, Application Withdrawn): 6 turbines · 3 MW each · 115 m tip height · applicant XSCH. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 6388.
The application was determined in about 18 months. Construction to first power took about 1 month. Permission was ultimately granted on appeal in September 2012. A planning permission on this site expired in March 2011. The scheme has been operating for about 11 years. That works out at 0.75 MW per turbine on average.
| Data | Source | Extract |
|---|---|---|
| Site, capacity, status, planning milestones | Renewable Energy Planning Database (DESNZ, Open Government Licence v3) | Q2 2026, published 03/08/2026 |
| Turbine positions | OpenStreetMap contributors (ODbL) | 19/08/2026 |
| Manufacturer and model | OpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong. | 19/08/2026 |
Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.