16 turbines · operational · West Glamorgan
| Status | Operational |
|---|---|
| County / region | West Glamorgan |
| Turbines | 16 |
| Installed capacity | 32 MW |
| Turbine capacity | 2 MW |
| Tip height | not recorded |
| Operator (or applicant) | RWE npower |
| Turbine manufacturer | Siemens Gamesa |
| Turbine model | SWT-3.0 |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 3 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4677.
The application was determined in about 6 months. A planning permission on this site expired in May 2013. The scheme has been operating for about 21 years. At that age, wind farms commonly become candidates for repowering or life extension — nothing in the register confirms such a plan here. That works out at 2 MW per turbine on average.