2 turbines · operational · Highland
| Status | Operational |
|---|---|
| County / region | Highland |
| Turbines | 2 |
| Installed capacity | 2.6 MW |
| Turbine capacity | not recorded |
| Tip height | 99 m |
| Operator (or applicant) | Renewable Energy Systems (RES) |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 2 years.
The register links a second scheme on this site (REPD ref 4679, Operational): 4 turbines · 1.3 MW each · applicant Renewable Energy Systems (RES). Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 6636.
Construction to first power took about 6 months. The scheme has been operating for about 23 years. At that age, wind farms commonly become candidates for repowering or life extension — nothing in the register confirms such a plan here. That works out at 1.3 MW per turbine on average.
See all wind farms in Highland.