🌬️ Onshore wind farm

Forss Wind Farm (Extension)
Highland

Recorded in WhichWindTurbine: 2 wind turbines in operation. Point the app at one of them to see its profile in real time.

2
turbines
2.6 MW
MW total
99 m
tip height

📍 4 turbines mapped — each dot is a turbine recorded in the database. Average position: 58.60447 N · 3.67162 W.

Forss Wind Farm (Extension)

2 turbines · operational · Highland

Wind farm facts

StatusOperational
County / regionHighland
Turbines2
Installed capacity2.6 MW
Turbine capacitynot recorded
Tip height99 m
Operator (or applicant)Renewable Energy Systems (RES)
Turbine manufacturerSiemens (secondary source)
Turbine modelSWT-1.3 (secondary source)
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

○ Cross-checked reference — turbine make and model (secondary source)

Siemens · SWT-1.3 · 4 turbines · 1.3 MW each

Source: Wikipedia, list of onshore wind farms in the United Kingdom (compiled from UKWED and The Wind Power), read on 2026-09-19. This is a compiled list, not a primary record. It is shown because two independent facts — turbine count and rated power — match the database exactly. Awaiting confirmation from a primary source.

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~203020052010201520202025today1234
  1. 1Jan 2005 — Application submitted
  2. 2Oct 2006 — Permission granted
  3. 3Jan 2007 — Under construction
  4. 4Jul 2007 — Operational

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 2 years.

The register links a second scheme on this site (REPD ref 4679, Operational): 4 turbines · 1.3 MW each · applicant Renewable Energy Systems (RES). Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 6636.

What the register tells us

Construction to first power took about 6 months. The scheme has been operating for about 23 years. At that age, wind farms commonly become candidates for repowering or life extension — nothing in the register confirms such a plan here. That works out at 1.3 MW per turbine on average.

Nearby

See all wind farms in Highland.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.