8 turbines · under construction · Grampian

Wind farm facts

StatusUnder Construction
County / regionGrampian
Turbines8
Installed capacity46.2 MW
Turbine capacitynot recorded
Tip height200 m
Operator (or applicant)Energiekontor UK Limited / Uniper
Turbine manufacturernot recorded
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

2021202220232024202520262027today1234
  1. 1Jan 2021 — Application submitted
  2. 2Nov 2021 — Permission granted
  3. 3Sep 2022 — Granted on appeal
  4. 4Mar 2025 — Under construction

The register also records a planning permission expiry in Sep 2027, after construction had started: an administrative date with no effect on the wind farm, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 8468.

What the register tells us

The application was determined in about 10 months. Permission was ultimately granted on appeal in September 2022. A planning permission on this site expired in September 2027. That works out at 5.78 MW per turbine on average.

Nearby

See all wind farms in Grampian.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.