Recorded in WhichWindTurbine: 20 wind turbines in operation. Point the app at one of them to see its profile in real time.
📍 20 turbines mapped — each dot is a turbine recorded in the database. Average position: 57.32282 N · 4.10243 W.
20 turbines · operational · Highland
| Status | Operational |
|---|---|
| County / region | Highland |
| Turbines | 20 |
| Installed capacity | 48.5 MW |
| Turbine capacity | 2.5 MW |
| Tip height | 110 m |
| Operator (or applicant) | Greencoat UK Wind |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
DevelopmentConstructionOperationAhead (repowering horizon at 22 years)
From application to operation, this scheme took about 9 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4371.
The application was determined in about 22 months. The register records a refusal in September 2014 before the scheme progressed. Permission was ultimately granted on appeal in April 2015. A planning permission on this site expired in April 2018. The scheme has been operating for about 4 years. That works out at 2.42 MW per turbine on average.
See all wind farms in Highland.
| Data | Source | Extract |
|---|---|---|
| Site, capacity, status, planning milestones | Renewable Energy Planning Database (DESNZ, Open Government Licence v3) | Q2 2026, published 03/08/2026 |
| Turbine positions | OpenStreetMap contributors (ODbL) | 19/08/2026 |
| Manufacturer and model | OpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong. | 19/08/2026 |
Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.