🌬️ Onshore wind farm

Graig Fatha Farm
Rhondda Cynon Taff

Recorded in WhichWindTurbine: 1 wind turbine in operation. Point the app at one of them to see its profile in real time.

1
turbines
2.5 MW
MW total
2.5 MW
per turbine
126 m
tip height

📍 1 turbine mapped — each dot is a turbine recorded in the database. Average position: 51.55997 N · 3.4333 W.

Graig Fatha Farm

1 turbines · operational · Rhondda Cynon Taff

Wind farm facts

StatusOperational
County / regionRhondda Cynon Taff
Turbines1
Installed capacity2.5 MW
Turbine capacity2.5 MW
Tip height126 m
Operator (or applicant)Cleanearth
Turbine manufacturernot recorded
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~204420182020202220242026today1234
  1. 1May 2017 — Application submitted
  2. 2Jun 2017 — Permission granted
  3. 3Oct 2021 — Under construction
  4. 4Dec 2021 — Operational

The register also records a planning permission expiry in Mar 2023, after construction had started: an administrative date with no effect on the wind farm, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 4 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 6422.

What the register tells us

The application was determined in about 1 month. Construction to first power took about 2 months. A planning permission on this site expired in March 2023. The scheme has been operating for about 5 years. That works out at 2.5 MW per turbine on average.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.