🌬️ Onshore wind farm

Green Park
Berkshire

Recorded in WhichWindTurbine: 1 wind turbine in operation. Point the app at one of them to see its profile in real time.

1
turbines
2 MW
MW total
2 MW
per turbine

📍 1 turbine mapped — each dot is a turbine recorded in the database. Average position: 51.41866 N · 0.98558 W.

Green Park

1 turbines · operational · Berkshire

Wind farm facts

StatusOperational
County / regionBerkshire
Turbines1
Installed capacity2 MW
Turbine capacity2 MW
Tip heightnot recorded
Operator (or applicant)Ecotricity / Prudential
Turbine manufacturerEnercon
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~202820052010201520202025today123
  1. 1Mar 2004 — Application submitted
  2. 2Jul 2004 — Permission granted
  3. 3Oct 2005 — Operational

The register also records a planning permission expiry in Jul 2017, after commissioning: an administrative date with no effect on the operating wind farm, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 1 year.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3210.

What the register tells us

The application was determined in about 4 months. A planning permission on this site expired in July 2017. The scheme has been operating for about 21 years. At that age, wind farms commonly become candidates for repowering or life extension — nothing in the register confirms such a plan here. That works out at 2 MW per turbine on average.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.