1 turbines · operational · Cambridgeshire
| Status | Operational |
|---|---|
| County / region | Cambridgeshire |
| Turbines | 1 |
| Installed capacity | 1.5 MW |
| Turbine capacity | 1.5 MW |
| Tip height | not recorded |
| Operator (or applicant) | Greenvale AP |
| Turbine manufacturer | not recorded |
| Turbine model | Acciona AW77-1500 |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 2 years.
The register links a second scheme on this site (REPD ref 2821, Revised): 1 turbines · 2 MW each · applicant Greenvale AP. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4374.
The application was determined in about 2 months. Construction to first power took about 3 months. A planning permission on this site expired in September 2010. The scheme has been operating for about 12 years. That works out at 1.5 MW per turbine on average.
See all wind farms in Cambridgeshire.