🌬️ Onshore wind farm

Gremista Wind Farm
Shetland

Recorded in WhichWindTurbine: 1 wind turbine in operation. Point the app at one of them to see its profile in real time.

1
turbines
3 MW
MW total
3 MW
per turbine

📍 1 turbine mapped — each dot is a turbine recorded in the database. Average position: 60.19258 N · 1.16622 W.

Gremista Wind Farm

1 turbines · operational · Shetland

Wind farm facts

StatusOperational
County / regionShetland
Turbines1
Installed capacity3 MW
Turbine capacity3 MW
Tip heightnot recorded
Operator (or applicant)Shetland Aerogenerators
Turbine manufacturerEnercon
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~2038201520202025today1234
  1. 1Aug 2011 — Application submitted
  2. 2Feb 2012 — Permission granted
  3. 3Jul 2015 — Under construction
  4. 4Nov 2015 — Operational

The register also records a planning permission expiry in Feb 2011, in the same month as, or before, the permission was granted: it refers to an earlier permission, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 4 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4075.

What the register tells us

The application was determined in about 6 months. Construction to first power took about 4 months. A planning permission on this site expired in February 2011. The scheme has been operating for about 11 years. That works out at 3 MW per turbine on average.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.