🌬️ Onshore wind farm

Hadyard Hill
Strathclyde · South Ayrshire

Recorded in WhichWindTurbine: 52 wind turbines Siemens Gamesa in operation. Point the app at one of them to see its profile in real time.

52
turbines
119.6
MW total
2.3 MW
per turbine
80 m
rotor diameter

📍 52 turbines mapped — each dot is a turbine recorded in the database. Average position: 55.2401 N · 4.74037 W.

Wind farm facts

LocationStrathclyde — South Ayrshire
TypeOnshore wind
Number of turbines (database)52
ManufacturerSiemens Gamesa
ModelData not available
Rated power per turbine2.3 MW
Total capacity (database)119.6 MW
Rotor diameter80 m
Tip heightData not available
Commissioning year2006
StatusOperational
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Life stage of the wind farm

Life stage: mature operation. Commissioned in 2006 (20 years ago), this wind farm is approaching its renewal window. Estimate: based on a ~22-year lifetime, the repowering window would be around 2028 indicative projection.

Frequently asked questions

How many wind turbines does Hadyard Hill have?

The WhichWindTurbine database records 52 wind turbines in operation at this site, with a total capacity of about 119.6 MW (sources: REPD and OpenStreetMap).

Where is Hadyard Hill located?

Area: Strathclyde — South Ayrshire. The average position of the wind farm is 55.2401 N / 4.74037 W.

How can I identify a turbine at this wind farm?

With the WhichWindTurbine web app: from an open viewpoint, point your phone at a turbine. The app combines your GPS position, compass and camera with its database to show the profile of the turbine you are looking at.

When was Hadyard Hill commissioned?

The commissioning year recorded in the database is 2006. Public data may differ slightly from the operator's official date.

When could this wind farm be repowered?

Based on a typical lifetime of ~22 years for an onshore wind farm, the repowering window would be around 2028. Indicative projection only — no operator decision is implied.

Data sources

Wind farm data: Renewable Energy Planning Database (REPD, Department for Energy Security and Net Zero — Open Government Licence) for site attributes, and © OpenStreetMap contributors (ODbL) for turbine positions, as integrated in WhichWindTurbine. "Data not available" means the public sources do not record that attribute for this site.