🌬️ Onshore wind farm

Hadyard Hill
Strathclyde · South Ayrshire

Recorded in WhichWindTurbine: 52 wind turbines Siemens Gamesa in operation. Point the app at one of them to see its profile in real time.

52
turbines
119.6
MW total
2.3 MW
per turbine
80 m
rotor diameter

📍 52 turbines mapped — each dot is a turbine recorded in the database. Average position: 55.2401 N · 4.74037 W.

Wind farm facts

LocationStrathclyde — South Ayrshire
TypeOnshore wind
Number of turbines (database)52
ManufacturerSiemens
ModelSWT-2.3-82
Rated power per turbine2.3 MW
Total capacity (database)119.6 MW
Rotor diameter80 m
Tip heightData not available
Commissioning year2006
StatusOperational
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

✓ Verified reference — turbine make and model

Siemens · SWT-2.3-82 · 52 turbines · 2.3 MW each

Source: SSE Renewables, official project page, 2026, read on 2026-09-14. Corroborated by 2 further sources. OpenStreetMap tags shown elsewhere on this page differ from this record; the sources above prevail.

✓ Independently confirmed on 2026-09-19 by Wikipedia, list of onshore wind farms in the United Kingdom (secondary source, compiled from UKWED): 52 Bonus B2300 (2.3 MW), 2006 — the B2300 is the SWT-2.3-82 under its Bonus name.

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~202820052010201520202025today1234
  1. 1May 2003 — Application submitted
  2. 2Dec 2003 — Permission granted
  3. 3May 2006 — Under construction
  4. 4May 2006 — Operational

The register also records a planning permission expiry in Dec 2008, after construction had started: an administrative date with no effect on the wind farm, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

Operator (or applicant): Scottish and Southern Energy (SSE) · Turbines: 52 · Turbine capacity: 2.3 MW · Status: Operational

The register links a second scheme on this site (REPD ref 3375, Application Withdrawn): 22 turbines · 4 MW each · 127 m tip height · applicant Scottish and Southern Energy (SSE). Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3109.

Frequently asked questions

How many wind turbines does Hadyard Hill have?

The WhichWindTurbine database records 52 wind turbines in operation at this site, with a total capacity of about 119.6 MW (sources: REPD and OpenStreetMap).

Where is Hadyard Hill located?

Area: Strathclyde — South Ayrshire. The average position of the wind farm is 55.2401 N / 4.74037 W.

How can I identify a turbine at this wind farm?

With the WhichWindTurbine web app: from an open viewpoint, point your phone at a turbine. The app combines your GPS position, compass and camera with its database to show the profile of the turbine you are looking at.

When was Hadyard Hill commissioned?

The commissioning year recorded in the database is 2006. Public data may differ slightly from the operator's official date.

When could this wind farm be repowered?

Based on a typical lifetime of ~22 years for an onshore wind farm, the repowering window would be around 2028. Indicative projection only — no operator decision is implied.

Data sources

Wind farm data: Renewable Energy Planning Database (REPD, Department for Energy Security and Net Zero — Open Government Licence) for site attributes, and © OpenStreetMap contributors (ODbL) for turbine positions, as integrated in WhichWindTurbine. "Data not available" means the public sources do not record that attribute for this site.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.