Hagshaw Hill Wind Farm

13 turbines · operational · Strathclyde

Wind farm facts

StatusOperational
County / regionStrathclyde
Turbines13
Installed capacity7.8 MW
Turbine capacity0.6 MW
Tip heightnot recorded
Operator (or applicant)Trigen
Turbine manufacturerNordex
Turbine modelN149

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

1993 1995 1997 1999 2001 2003 2005 2007 2009 2011 2013 Scheme REPD 3593 Application submitted May 1994 Permission granted November 1994 Operational November 1995 Permission expired November 2013 Scheme REPD 3301 Application submitted May 1994 Permission granted November 1994 Operational November 1995 Permission expired November 2013

From application to operation, this scheme took about 1 year.

The register links a second scheme on this site (REPD ref 3301, Operational): 13 turbines · 0.6 MW each · applicant Trigen. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3593.

What the register tells us

The application was determined in about 6 months. A planning permission on this site expired in November 2013. The scheme has been operating for about 31 years. At that age, wind farms commonly become candidates for repowering or life extension — nothing in the register confirms such a plan here. That works out at 0.6 MW per turbine on average.