🌬️ Onshore wind farm

Hampole Wind Farm
South Yorkshire

Recorded in WhichWindTurbine: 4 wind turbines in operation. Point the app at one of them to see its profile in real time.

4
turbines
8 MW
MW total
2 MW
per turbine

📍 4 turbines mapped — each dot is a turbine recorded in the database. Average position: 53.57574 N · 1.23086 W.

Hampole Wind Farm

4 turbines · operational · South Yorkshire

Wind farm facts

StatusOperational
County / regionSouth Yorkshire
Turbines4
Installed capacity8 MW
Turbine capacity2 MW
Tip heightnot recorded
Operator (or applicant)Good Energy (previously nPower Renewables)
Turbine manufacturerREpower (now Senvion) (secondary source)
Turbine modelMM92 (secondary source)
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

○ Cross-checked reference — turbine make and model (secondary source)

REpower (now Senvion) · MM92 · 4 turbines · 2.05 MW each

Source: Wikipedia, list of onshore wind farms in England (compiled from RenewableUK's UKWED and The Wind Power), read on 2026-09-19. This is a compiled list, not a primary record. It is shown because two independent facts — turbine count and rated power — match the database exactly. Awaiting confirmation from a primary source.

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~20362010201520202025today12345
  1. 1Sep 2008 — Application submitted
  2. 2Dec 2009 — Permission granted
  3. 3Dec 2010 — Permission expired
  4. 4Jun 2013 — Under construction
  5. 5Mar 2014 — Operational

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 6 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3957.

What the register tells us

The application was determined in about 15 months. Construction to first power took about 9 months. A planning permission on this site expired in December 2010. The scheme has been operating for about 12 years. That works out at 2 MW per turbine on average.

Nearby

See all wind farms in South Yorkshire.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.