🌬️ Onshore wind farm

Harestanes
Dumfries and Galloway · Dumfries and Galloway

Recorded in WhichWindTurbine: 68 wind turbines in operation. Point the app at one of them to see its profile in real time.

68
turbines
136
MW total
2 MW
per turbine
n/a
rotor diameter

📍 68 turbines mapped — each dot is a turbine recorded in the database. Average position: 55.2498 N · 3.56278 W.

Wind farm facts

LocationDumfries and Galloway — Dumfries and Galloway
TypeOnshore wind
Number of turbines (database)68
ManufacturerGamesa (now Siemens Gamesa)
ModelG87-2.0
Rated power per turbine2 MW
Total capacity (database)136 MW
Rotor diameterData not available
Tip heightData not available
Commissioning year2014
StatusOperational
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

✓ Verified reference — turbine make and model

Gamesa (now Siemens Gamesa) · G87-2.0 · 68 turbines · 2 MW each

Source: Farrans, construction contractor for the wind farm, 2014, read on 2026-09-14. Corroborated by 3 further sources. Where OpenStreetMap tags differ, this record prevails.

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~203620052010201520202025today123456
  1. 1Mar 2004 — Application submitted
  2. 2Dec 2005 — Refused
  3. 3Sep 2007 — Permission granted
  4. 4Sep 2007 — Granted on appeal
  5. 5Oct 2012 — Under construction
  6. 6Jul 2014 — Operational

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

Operator (or applicant): Scottish Power Renewables · Turbines: 68 · Turbine capacity: 2 MW · Status: Operational

The register links a second scheme on this site (REPD ref 4590, Application Refused): 7 turbines · 2 MW each · applicant Scottish Power Renewables. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4119.

Frequently asked questions

How many wind turbines does Harestanes have?

The WhichWindTurbine database records 68 wind turbines in operation at this site, with a total capacity of about 136 MW (sources: REPD and OpenStreetMap).

Where is Harestanes located?

Area: Dumfries and Galloway — Dumfries and Galloway. The average position of the wind farm is 55.2498 N / 3.56278 W.

How can I identify a turbine at this wind farm?

With the WhichWindTurbine web app: from an open viewpoint, point your phone at a turbine. The app combines your GPS position, compass and camera with its database to show the profile of the turbine you are looking at.

When was Harestanes commissioned?

The commissioning year recorded in the database is 2014. Public data may differ slightly from the operator's official date.

When could this wind farm be repowered?

Based on a typical lifetime of ~22 years for an onshore wind farm, the repowering window would be around 2036. Indicative projection only — no operator decision is implied.

Data sources

Wind farm data: Renewable Energy Planning Database (REPD, Department for Energy Security and Net Zero — Open Government Licence) for site attributes, and © OpenStreetMap contributors (ODbL) for turbine positions, as integrated in WhichWindTurbine. "Data not available" means the public sources do not record that attribute for this site.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.