Hellrigg Wind farm

6 turbines · revised · Cumbria

Wind farm facts

StatusRevised
County / regionCumbria
Turbines6
Installed capacity7.8 MW
Turbine capacity1.3 MW
Tip heightnot recorded
Operator (or applicant)Npower Renewables
Turbine manufacturernot recorded
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

2003 2005 2007 2009 2011 2013 2015 2017 2019 Original scheme Application submitted June 2004 Refused October 2004 Later scheme Application submitted January 2007 Permission granted December 2007 Under construction May 2011 Operational September 2011 Permission expired December 2019

The register links a second scheme on this site (REPD ref 3002, Operational): 4 turbines · 2.5 MW each · applicant Npower Renewables. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3543.

What the register tells us

The register records a refusal in October 2004 before the scheme progressed. That works out at 1.3 MW per turbine on average.