Hill of Glaschyle Wind Farm

12 turbines · operational · Grampian

Wind farm facts

StatusOperational
County / regionGrampian
Turbines12
Installed capacity27.6 MW
Turbine capacity2.3 MW
Tip height99 m
Operator (or applicant)Muirden Energy
Turbine manufacturernot recorded
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

2012 2013 2014 2015 2016 2017 Project timeline Application submitted January 2013 Refused December 2013 Permission granted March 2014 Granted on appeal March 2014 Permission expired March 2014 Under construction June 2016 Operational December 2016

From application to operation, this scheme took about 3 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4381.

What the register tells us

The application was determined in about 14 months. Construction to first power took about 6 months. The register records a refusal in December 2013 before the scheme progressed. Permission was ultimately granted on appeal in March 2014. A planning permission on this site expired in March 2014. The scheme has been operating for about 10 years. That works out at 2.3 MW per turbine on average.