🌬️ Onshore wind farm

Hook Moor
West Yorkshire

Recorded in WhichWindTurbine: 3 wind turbines in operation. Point the app at one of them to see its profile in real time.

3
turbines
10.3 MW
MW total
2.05 MW
per turbine
125 m
tip height

📍 3 turbines mapped — each dot is a turbine recorded in the database. Average position: 53.80973 N · 1.33267 W.

Hook Moor

3 turbines · operational · West Yorkshire

Wind farm facts

StatusOperational
County / regionWest Yorkshire
Turbines3
Installed capacity10.3 MW
Turbine capacity2.05 MW
Tip height125 m
Operator (or applicant)Banks Renewables
Turbine manufacturernot recorded
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~20382010201520202025today123456
  1. 1Feb 2008 — Application submitted
  2. 2Aug 2009 — Refused
  3. 3Dec 2011 — Permission granted
  4. 4Dec 2011 — Granted on appeal
  5. 5Mar 2015 — Under construction
  6. 6Jan 2016 — Operational

The register also records a planning permission expiry in Dec 2016, after construction had started: an administrative date with no effect on the wind farm, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 8 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4658.

What the register tells us

The application was determined in about 46 months. Construction to first power took about 10 months. The register records a refusal in August 2009 before the scheme progressed. Permission was ultimately granted on appeal in December 2011. A planning permission on this site expired in December 2016. The scheme has been operating for about 10 years. That works out at 3.43 MW per turbine on average.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.