1 turbines · under construction · Aberdeenshire
| Status | Under Construction |
|---|---|
| County / region | Aberdeenshire |
| Turbines | 1 |
| Installed capacity | 1 MW |
| Turbine capacity | 1 MW |
| Tip height | 76 m |
| Operator (or applicant) | The James Hutton Institute |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 15874.
The application was determined in about 2 months. That works out at 1 MW per turbine on average.