13 turbines · under construction · Strathclyde
| Status | Under Construction |
|---|---|
| County / region | Strathclyde |
| Turbines | 13 |
| Installed capacity | 62 MW |
| Turbine capacity | 4.8 MW |
| Tip height | 180 m |
| Operator (or applicant) | Orsted Onshore Limited |
| Turbine manufacturer | Nordex |
| Turbine model | N133 |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4385.
The application was determined in about 30 months. A planning permission on this site expired in July 2020. That works out at 4.77 MW per turbine on average.