8 turbines · operational · Grampian
| Status | Operational |
|---|---|
| County / region | Grampian |
| Turbines | 8 |
| Installed capacity | 18.4 MW |
| Turbine capacity | 2.3 MW |
| Tip height | not recorded |
| Operator (or applicant) | Greencoat UK Wind/Bay Wa .r.e/ SunGift |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 7 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4114.
The application was determined in about 32 months. The register records a refusal in September 2007 before the scheme progressed. Permission was ultimately granted on appeal in August 2009. A planning permission on this site expired in August 2005. The scheme has been operating for about 13 years. That works out at 2.3 MW per turbine on average.
See all wind farms in Grampian.