🌬️ Onshore wind farm

Kilgallioch wind farm
Dumfries and Galloway · Dumfries and Galloway

Recorded in WhichWindTurbine: 96 wind turbines Vestas in operation. Point the app at one of them to see its profile in real time.

96
turbines
240
MW total
2.5 MW
per turbine
n/a
rotor diameter

📍 96 turbines mapped — each dot is a turbine recorded in the database. Average position: 55.0014 N · 4.79911 W.

Wind farm facts

LocationDumfries and Galloway — Dumfries and Galloway
TypeOnshore wind
Number of turbines (database)96
ManufacturerVestas
ModelV150-6.0
Rated power per turbine2.5 MW
Total capacity (database)240 MW
Rotor diameterData not available
Tip height137 m
Commissioning year2017
StatusOperational
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

🇬🇧 This model in the UK

This wind farm uses the V150-6.0 model. According to the WhichWindTurbine database, 10 V150-6.0 turbines are recorded in operation in the UK (model information is not available for every turbine).

♻️ Life stage of the wind farm

Life stage: full operation. Commissioned in 2017 (9 years ago), this wind farm is in the middle of its cycle. Estimate: based on a ~22-year lifetime, the repowering window would be around 2039 indicative projection.

Frequently asked questions

How many wind turbines does Kilgallioch wind farm have?

The WhichWindTurbine database records 96 wind turbines in operation at this site, with a total capacity of about 240 MW (sources: REPD and OpenStreetMap).

What type of turbines does this wind farm use?

Manufacturer: Vestas — model V150-6.0. This information comes from the public data integrated in WhichWindTurbine.

Where is Kilgallioch wind farm located?

Area: Dumfries and Galloway — Dumfries and Galloway. The average position of the wind farm is 55.0014 N / 4.79911 W.

How can I identify a turbine at this wind farm?

With the WhichWindTurbine web app: from an open viewpoint, point your phone at a turbine. The app combines your GPS position, compass and camera with its database to show the profile of the turbine you are looking at.

When was Kilgallioch wind farm commissioned?

The commissioning year recorded in the database is 2017. Public data may differ slightly from the operator's official date.

When could this wind farm be repowered?

Based on a typical lifetime of ~22 years for an onshore wind farm, the repowering window would be around 2039. Indicative projection only — no operator decision is implied.

Data sources

Wind farm data: Renewable Energy Planning Database (REPD, Department for Energy Security and Net Zero — Open Government Licence) for site attributes, and © OpenStreetMap contributors (ODbL) for turbine positions, as integrated in WhichWindTurbine. "Data not available" means the public sources do not record that attribute for this site.