26 turbines · operational · Strathclyde
| Status | Operational |
|---|---|
| County / region | Strathclyde |
| Turbines | 26 |
| Installed capacity | 88.4 MW |
| Turbine capacity | 3.4 MW |
| Tip height | not recorded |
| Operator (or applicant) | Banks Renewables |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 8 years.
The register links a second scheme on this site (REPD ref 4628, Operational): 15 turbines · 4.48 MW each · 200 m tip height · applicant Banks Renewables. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4643.
The application was determined in about 33 months. Construction to first power took about 31 months. A planning permission on this site expired in May 2019. The scheme has been operating for about 7 years. That works out at 3.4 MW per turbine on average.