Recorded in WhichWindTurbine: 26 wind turbines in operation. Point the app at one of them to see its profile in real time.
📍 15 turbines mapped — each dot is a turbine recorded in the database. Average position: 55.63164 N · 4.03736 W.
26 turbines · operational · Strathclyde
| Status | Operational |
|---|---|
| County / region | Strathclyde |
| Turbines | 26 |
| Installed capacity | 88.4 MW |
| Turbine capacity | 3.4 MW |
| Tip height | not recorded |
| Operator (or applicant) | Banks Renewables |
| Turbine manufacturer | Nordex |
| Turbine model | model not established |
Nordex · model not established · 15 turbines · 4.48 MW each
Source: GlobalData / Power Technology, wind farm profile, 2024-02, read on 2026-09-14. Corroborated by 4 further sources. Where OpenStreetMap tags differ, this record prevails.
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
The register also records a planning permission expiry in Sep 2016, in the same month as, or before, the permission was granted: it refers to an earlier permission, left off the axis.
DevelopmentConstructionOperationAhead (repowering horizon at 22 years)
From application to operation, this scheme took about 8 years.
The register links a second scheme on this site (REPD ref 4628, Operational): 15 turbines · 4.48 MW each · 200 m tip height · applicant Banks Renewables. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4643.
The application was determined in about 33 months. Construction to first power took about 31 months. A planning permission on this site expired in May 2019. The scheme has been operating for about 7 years. That works out at 3.4 MW per turbine on average.
See all wind farms in Strathclyde.
| Data | Source | Extract |
|---|---|---|
| Site, capacity, status, planning milestones | Renewable Energy Planning Database (DESNZ, Open Government Licence v3) | Q2 2026, published 03/08/2026 |
| Turbine positions | OpenStreetMap contributors (ODbL) | 19/08/2026 |
| Manufacturer and model | OpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong. | 19/08/2026 |
Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.