10 turbines · under construction · Highland
| Status | Under Construction |
|---|---|
| County / region | Highland |
| Turbines | 10 |
| Installed capacity | 49.9 MW |
| Turbine capacity | not recorded |
| Tip height | 200 m |
| Operator (or applicant) | Energiekontor UK Limited |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 8884.
The application was determined in about 9 months. A planning permission on this site expired in November 2024. That works out at 4.99 MW per turbine on average.