Land at Flimby Hall Farm

3 turbines · revised · Cumbria

Wind farm facts

StatusRevised
County / regionCumbria
Turbines3
Installed capacity9.5 MW
Turbine capacity3.16 MW
Tip heightnot recorded
Operator (or applicant)Flimby Wind Energy Ltd
Turbine manufacturernot recorded
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

2006 2007 2008 2009 2010 2011 2012 2013 2014 Original scheme Application submitted December 2007 Permission granted October 2008 Later scheme Application submitted June 2009 Refused December 2009 Permission granted June 2010 Granted on appeal June 2010 Under construction April 2012 Operational June 2013

The register links a second scheme on this site (REPD ref 3972, Operational): 3 turbines · 2.05 MW each · applicant Flimby Wind Energy Ltd. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3048.

What the register tells us

The application was determined in about 10 months. That works out at 3.17 MW per turbine on average.