1 turbines · revised · Cornwall
| Status | Revised |
|---|---|
| County / region | Cornwall |
| Turbines | 1 |
| Installed capacity | 1.5 MW |
| Turbine capacity | 1.5 MW |
| Tip height | 99 m |
| Operator (or applicant) | Cornwall Council |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
The register links a second scheme on this site (REPD ref 7588, Operational): 1 turbines · 99 m tip height · applicant Cornwall Council. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 5153.
The application was determined in about 7 months. A planning permission on this site expired in October 2018. That works out at 1.5 MW per turbine on average.
See all wind farms in Cornwall.