🌬️ Onshore wind farm

Lindhurst Wind Farm
Nottinghamshire

Recorded in WhichWindTurbine: 5 wind turbines in operation. Point the app at one of them to see its profile in real time.

5
turbines
15 MW
MW total
3 MW
per turbine

📍 5 turbines mapped — each dot is a turbine recorded in the database. Average position: 53.11706 N · 1.14354 W.

Lindhurst Wind Farm

5 turbines · operational · Nottinghamshire

Wind farm facts

StatusOperational
County / regionNottinghamshire
Turbines5
Installed capacity15 MW
Turbine capacity3 MW
Tip heightnot recorded
Operator (or applicant)Npower Renewables
Turbine manufacturernot recorded
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~20332010201520202025today1234
  1. 1Jun 2006 — Application submitted
  2. 2Sep 2007 — Permission granted
  3. 3Jan 2010 — Under construction
  4. 4Nov 2010 — Operational

The register also records a planning permission expiry in Sep 2011, after construction had started: an administrative date with no effect on the wind farm, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 4 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 2938.

What the register tells us

The application was determined in about 15 months. Construction to first power took about 10 months. A planning permission on this site expired in September 2011. The scheme has been operating for about 16 years. That works out at 3 MW per turbine on average.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.