🌬️ Onshore wind farm

Llynfi Afan Renewable Energy Park
Neath Port Talbot

Recorded in WhichWindTurbine: 3 wind turbines in operation. Point the app at one of them to see its profile in real time.

3
turbines
6 MW
MW total
2 MW
per turbine

📍 3 turbines mapped — each dot is a turbine recorded in the database. Average position: 51.64065 N · 3.61012 W.

Llynfi Afan Renewable Energy Park

3 turbines · operational · Neath Port Talbot

Wind farm facts

StatusOperational
County / regionNeath Port Talbot
Turbines3
Installed capacity6 MW
Turbine capacity2 MW
Tip heightnot recorded
Operator (or applicant)John Laing Environmental Assets Group
Turbine manufacturernot recorded
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~2040201520202025today1234
  1. 1Nov 2010 — Application submitted
  2. 2Jul 2013 — Permission granted
  3. 3May 2016 — Under construction
  4. 4Sep 2017 — Operational

The register also records a planning permission expiry in Jul 2018, after construction had started: an administrative date with no effect on the wind farm, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 7 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4644.

What the register tells us

The application was determined in about 32 months. Construction to first power took about 16 months. A planning permission on this site expired in July 2018. The scheme has been operating for about 9 years. That works out at 2 MW per turbine on average.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.