8 turbines · under construction · West Lothian
| Status | Under Construction |
|---|---|
| County / region | West Lothian |
| Turbines | 8 |
| Installed capacity | 45.6 MW |
| Turbine capacity | 5.7 MW |
| Tip height | 200 m |
| Operator (or applicant) | EnergieKontor UK |
| Turbine manufacturer | Siemens Gamesa |
| Turbine model | SG 5.8-155 |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 6327.
The application was determined in about 12 months. A planning permission on this site expired in April 2025. That works out at 5.7 MW per turbine on average.