🌬️ Onshore wind farm

Longpark
Borders

Recorded in WhichWindTurbine: 19 wind turbines in operation. Point the app at one of them to see its profile in real time.

19
turbines
38 MW
MW total
2 MW
per turbine

📍 19 turbines mapped — each dot is a turbine recorded in the database. Average position: 55.67046 N · 2.83354 W.

Longpark

19 turbines · operational · Borders

Wind farm facts

StatusOperational
County / regionBorders
Turbines19
Installed capacity38 MW
Turbine capacity2 MW
Tip heightnot recorded
Operator (or applicant)Wind Prospect
Turbine manufacturerSenvion
Turbine modelMM82 (secondary source)
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

○ Cross-checked reference — turbine make and model (secondary source)

REpower (now Senvion) · MM82 · 19 turbines · 2 MW each

Source: Wikipedia, list of onshore wind farms in the United Kingdom (compiled from UKWED and The Wind Power), read on 2026-09-19. This is a compiled list, not a primary record. It is shown because two independent facts — turbine count and rated power — match the database exactly. Awaiting confirmation from a primary source.

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~203220052010201520202025today1234
  1. 1Feb 2004 — Application submitted
  2. 2Aug 2005 — Permission granted
  3. 3Jun 2009 — Under construction
  4. 4Sep 2009 — Operational

The register also records a planning permission expiry in Aug 2016, after construction had started: an administrative date with no effect on the wind farm, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 5 years.

The register links a second scheme on this site (REPD ref 4576, Application Withdrawn): 5 turbines · 2.5 MW each · 110 m tip height · applicant Wind Prospect. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3605.

What the register tells us

The application was determined in about 18 months. Construction to first power took about 3 months. A planning permission on this site expired in August 2016. The scheme has been operating for about 17 years. That works out at 2 MW per turbine on average.

Nearby

See all wind farms in Borders.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.