7 turbines · operational · Cumbria
| Status | Operational |
|---|---|
| County / region | Cumbria |
| Turbines | 7 |
| Installed capacity | 4.7 MW |
| Turbine capacity | 0.67 MW |
| Tip height | not recorded |
| Operator (or applicant) | Windprospect |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 2 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3611.
The application was determined in about 9 months. The register records a refusal in October 1998 before the scheme progressed. Permission was ultimately granted on appeal in March 1999. A planning permission on this site expired in March 2016. The scheme has been operating for about 26 years. At that age, wind farms commonly become candidates for repowering or life extension — nothing in the register confirms such a plan here. That works out at 0.67 MW per turbine on average.