🌬️ Onshore wind farm

Magherafelt
Co. Derry / Londonderry

Recorded in WhichWindTurbine: 1 wind turbine in operation. Point the app at one of them to see its profile in real time.

1
turbines
1 MW
MW total
1 MW
per turbine

📍 1 turbine mapped — each dot is a turbine recorded in the database. Average position: 54.74962 N · 6.66536 W.

Magherafelt

1 turbines · operational · Co. Derry / Londonderry

Wind farm facts

StatusOperational
County / regionCo. Derry / Londonderry
Turbines1
Installed capacity1 MW
Turbine capacity1 MW
Tip heightnot recorded
Operator (or applicant)Tobermore Concrete Products
Turbine manufacturernot recorded
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~20372010201520202025today123
  1. 1Jul 2009 — Application submitted
  2. 2Nov 2010 — Permission granted
  3. 3Jun 2015 — Operational

The register also records a planning permission expiry in Nov 2015, after commissioning: an administrative date with no effect on the operating wind farm, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 6 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3678.

What the register tells us

The application was determined in about 16 months. A planning permission on this site expired in November 2015. The scheme has been operating for about 11 years. That works out at 1 MW per turbine on average.

Nearby

See all wind farms in Co. Derry / Londonderry.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.