1 turbines · operational · Co. Derry / Londonderry
| Status | Operational |
|---|---|
| County / region | Co. Derry / Londonderry |
| Turbines | 1 |
| Installed capacity | 1 MW |
| Turbine capacity | 1 MW |
| Tip height | not recorded |
| Operator (or applicant) | Tobermore Concrete Products |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 6 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3678.
The application was determined in about 16 months. A planning permission on this site expired in November 2015. The scheme has been operating for about 11 years. That works out at 1 MW per turbine on average.
See all wind farms in Co. Derry / Londonderry.