Meikle Carewe

14 turbines · revised · Grampian

Wind farm facts

StatusRevised
County / regionGrampian
Turbines14
Installed capacity14 MW
Turbine capacity1 MW
Tip heightnot recorded
Operator (or applicant)Renewable Energy Systems (RES)
Turbine manufacturernot recorded
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 Scheme REPD 3573 Application submitted March 2000 Refused December 2001 Scheme REPD 4109 Permission expired May 2000 Application submitted November 2006 Permission granted May 2010 Under construction July 2012 Operational July 2013

The register links a second scheme on this site (REPD ref 4109, Operational): 12 turbines · 0.85 MW each · applicant The Renewables Infrastructure Group (TRIG). Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3573.

What the register tells us

The register records a refusal in December 2001 before the scheme progressed. That works out at 1 MW per turbine on average.