🌬️ Onshore wind farm

Middlewick wind farm
Essex

Recorded in WhichWindTurbine: 9 wind turbines in operation. Point the app at one of them to see its profile in real time.

9
turbines
20.7 MW
MW total
2.3 MW
per turbine

📍 9 turbines mapped — each dot is a turbine recorded in the database. Average position: 51.65772 N · 0.88835 E.

Middlewick wind farm

9 turbines · operational · Essex

Wind farm facts

StatusOperational
County / regionEssex
Turbines9
Installed capacity20.7 MW
Turbine capacity2.3 MW
Tip heightnot recorded
Operator (or applicant)Blue Energy (formerly Ridgewind Ltd)
Turbine manufacturerSiemens Gamesa
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~20362010201520202025today123456
  1. 1Jan 2010 — Application submitted
  2. 2Aug 2010 — Refused
  3. 3May 2011 — Permission granted
  4. 4May 2011 — Granted on appeal
  5. 5Jun 2013 — Under construction
  6. 6Jul 2014 — Operational

The register also records a planning permission expiry in May 2010, in the same month as, or before, the permission was granted: it refers to an earlier permission, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 4 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4662.

What the register tells us

The application was determined in about 16 months. Construction to first power took about 13 months. The register records a refusal in August 2010 before the scheme progressed. Permission was ultimately granted on appeal in May 2011. A planning permission on this site expired in May 2010. The scheme has been operating for about 12 years. That works out at 2.3 MW per turbine on average.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.