6 turbines · under construction · Strathclyde
| Status | Under Construction |
|---|---|
| County / region | Strathclyde |
| Turbines | 6 |
| Installed capacity | 36 MW |
| Turbine capacity | 6 MW |
| Tip height | 250 m |
| Operator (or applicant) | Banks Renewables |
| Turbine manufacturer | Nordex |
| Turbine model | N163/5.x |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 12275.
The application was determined in about 33 months. A planning permission on this site expired in March 2027. That works out at 6 MW per turbine on average.