🌬️ Onshore wind farm

Millennium Extension
Highland

Recorded in WhichWindTurbine: 16 wind turbines in operation. Point the app at one of them to see its profile in real time.

16
turbines
40 MW
MW total
2.5 MW
per turbine
125 m
tip height

📍 4 turbines mapped — each dot is a turbine recorded in the database. Average position: 57.1309 N · 4.87107 W.

Millennium Extension

16 turbines · operational · Highland

Wind farm facts

StatusOperational
County / regionHighland
Turbines16
Installed capacity40 MW
Turbine capacity2.5 MW
Tip height125 m
Operator (or applicant)Renewable Development Company (RDC) Scotland (Ltd) for FALCK RENEWABLES
Turbine manufacturerNordex (secondary source)
Turbine modelN90 (secondary source)
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

○ Cross-checked reference — turbine make and model (secondary source)

Nordex · N90 · 4 turbines · 2.5 MW each

Source: Wikipedia, list of onshore wind farms in the United Kingdom (compiled from UKWED and The Wind Power), read on 2026-09-19. This is a compiled list, not a primary record. It is shown because two independent facts — turbine count and rated power — match the database exactly. Awaiting confirmation from a primary source.

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~20312010201520202025today1234
  1. 1Mar 2007 — Application submitted
  2. 2Jan 2008 — Permission granted
  3. 3Jan 2008 — Under construction
  4. 4Dec 2008 — Operational

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 5 years.

The register links a second scheme on this site (REPD ref 3598, Operational): 4 turbines · 2.5 MW each · 125 m tip height · applicant West Coast Energy /Falck Renewables. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4682.

What the register tells us

The application was determined in about 16 months. Construction to first power took about 25 months. The scheme has been operating for about 18 years. That works out at 2.5 MW per turbine on average.

Nearby

See all wind farms in Highland.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.