15 turbines · revised · Dumfries and Galloway
| Status | Revised |
|---|---|
| County / region | Dumfries and Galloway |
| Turbines | 15 |
| Installed capacity | 30 MW |
| Turbine capacity | 2 MW |
| Tip height | not recorded |
| Operator (or applicant) | Renewable Energy Systems (RES) |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
The register links a second scheme on this site (REPD ref 4437, Operational): 10 turbines · 2.5 MW each · applicant Minnygap (formerly RES). Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4521.
The register records a refusal in November 2007 before the scheme progressed. That works out at 2 MW per turbine on average.
See all wind farms in Dumfries and Galloway.