10 turbines · revised · County Durham
| Status | Revised |
|---|---|
| County / region | County Durham |
| Turbines | 10 |
| Installed capacity | 25 MW |
| Turbine capacity | 2.5 MW |
| Tip height | not recorded |
| Operator (or applicant) | Banks Renewables |
| Turbine manufacturer | Senvion |
| Turbine model | MM100 |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
The register links a second scheme on this site (REPD ref 4642, Operational): 6 turbines · 2.5 MW each · applicant Banks Renewables. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3454.
The register records a refusal in November 2010 before the scheme progressed. That works out at 2.5 MW per turbine on average.