Moor House Wind Farm

10 turbines · revised · County Durham

Wind farm facts

StatusRevised
County / regionCounty Durham
Turbines10
Installed capacity25 MW
Turbine capacity2.5 MW
Tip heightnot recorded
Operator (or applicant)Banks Renewables
Turbine manufacturerSenvion
Turbine modelMM100

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 Original scheme Application submitted October 2009 Refused November 2010 Later scheme Application submitted March 2011 Permission granted October 2011 Permission expired October 2014 Under construction January 2017 Operational December 2017

The register links a second scheme on this site (REPD ref 4642, Operational): 6 turbines · 2.5 MW each · applicant Banks Renewables. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3454.

What the register tells us

The register records a refusal in November 2010 before the scheme progressed. That works out at 2.5 MW per turbine on average.