6 turbines · operational · Strathclyde

Wind farm facts

StatusOperational
County / regionStrathclyde
Turbines6
Installed capacity12.3 MW
Turbine capacity2.05 MW
Tip heightnot recorded
Operator (or applicant)Lomond Energy
Turbine manufacturernot recorded
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Original scheme Application submitted March 2005 Permission granted October 2008 Permission expired October 2010 Operational January 2011 Later scheme Permission expired September 2011 Application submitted February 2012 Permission granted September 2012 Operational April 2014

From application to operation, this scheme took about 6 years.

The register links a second scheme on this site (REPD ref 3873, Operational): 2 turbines · 3.4 MW each · applicant Muirhall Energy. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4683.

What the register tells us

The application was determined in about 43 months. A planning permission on this site expired in October 2010. The scheme has been operating for about 15 years. That works out at 2.05 MW per turbine on average.