🌬️ Onshore wind farm

Muirhall
Strathclyde

Recorded in WhichWindTurbine: 6 wind turbines in operation. Point the app at one of them to see its profile in real time.

6
turbines
12.3 MW
MW total
2.05 MW
per turbine

📍 6 turbines mapped — each dot is a turbine recorded in the database. Average position: 55.76091 N · 3.58176 W.

Muirhall

6 turbines · operational · Strathclyde

Wind farm facts

StatusOperational
County / regionStrathclyde
Turbines6
Installed capacity12.3 MW
Turbine capacity2.05 MW
Tip heightnot recorded
Operator (or applicant)Lomond Energy
Turbine manufacturernot recorded
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~20332010201520202025today1234
  1. 1Mar 2005 — Application submitted
  2. 2Oct 2008 — Permission granted
  3. 3Oct 2010 — Permission expired
  4. 4Jan 2011 — Operational

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 6 years.

The register links a second scheme on this site (REPD ref 3873, Operational): 2 turbines · 3.4 MW each · applicant Muirhall Energy. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4683.

What the register tells us

The application was determined in about 43 months. A planning permission on this site expired in October 2010. The scheme has been operating for about 15 years. That works out at 2.05 MW per turbine on average.

Nearby

See all wind farms in Strathclyde.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.