Mynydd Portref

11 turbines · operational · Mid Glamorgan

Wind farm facts

StatusOperational
County / regionMid Glamorgan
Turbines11
Installed capacity9.4 MW
Turbine capacity0.85 MW
Tip heightnot recorded
Operator (or applicant)Gresham House
Turbine manufacturernot recorded
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Scheme REPD 3931 Application submitted June 2006 Permission granted July 2008 Operational March 2012 Permission expired July 2019 Scheme REPD 4194 Permission expired December 2011 Application submitted June 2012 Permission granted December 2014 Under construction April 2016 Operational March 2017

From application to operation, this scheme took about 6 years.

The register links a second scheme on this site (REPD ref 4194, Operational): 6 turbines · 2 MW each · applicant REG Windpower. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3931.

What the register tells us

The application was determined in about 25 months. A planning permission on this site expired in July 2019. The scheme has been operating for about 14 years. That works out at 0.85 MW per turbine on average.

Nearby

See all wind farms in Mid Glamorgan.