Mynydd Y Gwrhyd Windfarm

5 turbines · revised · West Glamorgan

Wind farm facts

StatusRevised
County / regionWest Glamorgan
Turbines5
Installed capacity12.5 MW
Turbine capacity2.5 MW
Tip heightnot recorded
Operator (or applicant)Awel Aman Tawe
Turbine manufacturernot recorded
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 Original scheme Application submitted September 2004 Refused September 2005 Later scheme Application submitted December 2010 Permission granted March 2013 Permission expired March 2014 Under construction March 2016 Operational December 2017

The register links a second scheme on this site (REPD ref 3896, Operational): 2 turbines · 2.35 MW each · applicant Awel Aman Tawe Community Energy. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3211.

What the register tells us

The register records a refusal in September 2005 before the scheme progressed. That works out at 2.5 MW per turbine on average.