🌬️ Onshore wind farm

Newton Marsh Wind Project
Lincolnshire

Recorded in WhichWindTurbine: 2 wind turbines in operation. Point the app at one of them to see its profile in real time.

2
turbines
4.6 MW
MW total
2.3 MW
per turbine

📍 2 turbines mapped — each dot is a turbine recorded in the database. Average position: 53.50892 N · 0.00717 E.

Newton Marsh Wind Project

2 turbines · operational · Lincolnshire

Wind farm facts

StatusOperational
County / regionLincolnshire
Turbines2
Installed capacity4.6 MW
Turbine capacity2.3 MW
Tip heightnot recorded
Operator (or applicant)TCI Renewables
Turbine manufacturerEnercon
Turbine modelE70
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~20362010201520202025today123456
  1. 1Jan 2008 — Application submitted
  2. 2May 2008 — Refused
  3. 3May 2009 — Permission granted
  4. 4May 2009 — Granted on appeal
  5. 5Jun 2012 — Under construction
  6. 6Apr 2014 — Operational

The register also records a planning permission expiry in May 2019, after construction had started: an administrative date with no effect on the wind farm, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 6 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3827.

What the register tells us

The application was determined in about 16 months. Construction to first power took about 22 months. The register records a refusal in May 2008 before the scheme progressed. Permission was ultimately granted on appeal in May 2009. A planning permission on this site expired in May 2019. The scheme has been operating for about 12 years. That works out at 2.3 MW per turbine on average.

Nearby

See all wind farms in Lincolnshire.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.