2 turbines · revised · Lancashire
| Status | Revised |
|---|---|
| County / region | Lancashire |
| Turbines | 2 |
| Installed capacity | 4 MW |
| Turbine capacity | 2 MW |
| Tip height | not recorded |
| Operator (or applicant) | Cornwall Light and Power |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
The register links a second scheme on this site (REPD ref 3703, Operational): 2 turbines · 2 MW each · applicant Renewable Energy Generation. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3979.
The application was determined in about 33 months. The register records a refusal in May 2008 before the scheme progressed. Permission was ultimately granted on appeal in December 2010. That works out at 2 MW per turbine on average.
See all wind farms in Lancashire.