Ovenden Moor (Repower)

10 turbines · revised · West Yorkshire

Wind farm facts

StatusRevised
County / regionWest Yorkshire
Turbines10
Installed capacity23 MW
Turbine capacity2.3 MW
Tip heightnot recorded
Operator (or applicant)Yorkshire Windpower
Turbine manufacturerSiemens Gamesa
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 Original scheme Application submitted March 2009 Later scheme Application submitted August 2012 Permission granted November 2012 Permission expired November 2012 Under construction May 2015 Operational January 2017

The register links a second scheme on this site (REPD ref 4408, Operational): 9 turbines · 2.5 MW each · 115 m tip height · applicant Yorkshire Windpower. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3993.

What the register tells us

That works out at 2.3 MW per turbine on average.