10 turbines · operational · Mid Glamorgan
| Status | Operational |
|---|---|
| County / region | Mid Glamorgan |
| Turbines | 10 |
| Installed capacity | 25 MW |
| Turbine capacity | 2.5 MW |
| Tip height | 115 m |
| Operator (or applicant) | Pennant Wind Energy Ventures (PWEV) |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 7 years.
The register links a second scheme on this site (REPD ref 4409, Operational): 8 turbines · 2.5 MW each · 125 m tip height · applicant Pennant Walters (PYWX). Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4039.
The application was determined in about 62 months. Construction to first power took about 14 months. The register records a refusal in April 2006 before the scheme progressed. Permission was ultimately granted on appeal in May 2011. A planning permission on this site expired in May 2016. The scheme has been operating for about 13 years. That works out at 2.5 MW per turbine on average.
See all wind farms in Mid Glamorgan.