Plascow wind cluster

3 turbines · revised · Dumfries and Galloway

Wind farm facts

StatusRevised
County / regionDumfries and Galloway
Turbines3
Installed capacity2.4 MW
Turbine capacity0.8 MW
Tip heightnot recorded
Operator (or applicant)Private Developer
Turbine manufacturernot recorded
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 Original scheme Application submitted November 2009 Refused April 2012 Later scheme Application submitted May 2013 Permission granted March 2014 Under construction April 2015 Operational July 2015 Permission expired March 2017

The register links a second scheme on this site (REPD ref 4484, Operational): 3 turbines · 0.8 MW each · applicant Private Developer. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4447.

What the register tells us

The register records a refusal in April 2012 before the scheme progressed. That works out at 0.8 MW per turbine on average.