4 turbines · operational · Merseyside
| Status | Operational |
|---|---|
| County / region | Merseyside |
| Turbines | 4 |
| Installed capacity | 10 MW |
| Turbine capacity | 2.5 MW |
| Tip height | not recorded |
| Operator (or applicant) | Mersey Docks and Harbour Company |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 4 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3533.
The application was determined in about 4 months. A planning permission on this site expired in December 2006. The scheme has been operating for about 17 years. That works out at 2.5 MW per turbine on average.