🌬️ Onshore wind farm

Quarrendon Fields
Buckinghamshire

Recorded in WhichWindTurbine: 1 wind turbine in operation. Point the app at one of them to see its profile in real time.

1
turbines
1.5 MW
MW total
1.5 MW
per turbine
144 m
tip height

📍 1 turbine mapped — each dot is a turbine recorded in the database. Average position: 51.84821 N · 0.84515 W.

Quarrendon Fields

1 turbines · operational · Buckinghamshire

Wind farm facts

StatusOperational
County / regionBuckinghamshire
Turbines1
Installed capacity1.5 MW
Turbine capacity1.5 MW
Tip height144 m
Operator (or applicant)AWE Renewables
Turbine manufacturerVensys
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~20372010201520202025today1234
  1. 1Feb 2010 — Application submitted
  2. 2Mar 2012 — Permission granted
  3. 3Mar 2012 — Granted on appeal
  4. 4Dec 2014 — Operational

The register also records a planning permission expiry in Mar 2015, after commissioning: an administrative date with no effect on the operating wind farm, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 4 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4908.

What the register tells us

The application was determined in about 25 months. Permission was ultimately granted on appeal in March 2012. A planning permission on this site expired in March 2015. The scheme has been operating for about 12 years. That works out at 1.5 MW per turbine on average.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.